Highway Maintenance
1/23/23-1/27/23 8 am – 2 pm Shoulder Work Potential one lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. S Hilo Stainback Highway- Zoo to North Kūlani Weather permitting
1/23/23-1/27/23 8 am – 2 pm Weed Control/grass cutting Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Kona Middle Ke’ei Rd from Hwy 11 to Napo’opo’o Rd Weather permitting
1/23/23-1/27/23 8 am – 2 pm Weed Control Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Kona Old Māmalahoa Highway Hwy 190 to Hwy 11 Weather permitting
1/25/23-1/27/23 8 am – 2 pm Bridge Repair Road closure, to All Traffic ; flaggers directing traffic; large trucks and personnel will on the Roadway N.Hilo Old Mamalahoa Hwy from Hana Ika Luna Camp to Hwy 19 Weather permitting
1/23/23-1/27/23 8am -5pm Tree Trimming Private contractor Road closure, but limited to only Farmers and Resident of the Valley ; flaggers directing traffic; large trucks and personnel will on the Roadway Hāmākua Waipi’o Valley Road from Guard Shack to Hiilawe Stream Weather permitting
1/23/23-1/27/23 8 am – 2 pm Shoulder Work Potential one lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. Kona Napo’opo’o Rd from Middle Ke’ei to Hwy 11 Weather permitting
1/23/23-1/27/23 8 am-2 pm Removing Debris Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Hāmākua Hwy240 from milemarker 1-9.5 Weather permitting
1/23/23-1/27/23 8 am-2 pm Removing Debris Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Hāmākua Āhualoa Weather permitting
1/23/23-1/27/23 8 am – 2 pm Shoulder Maintenance/Scraping EP for drainage Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Puna Kaohe Homestead rd. (Pahoa School) Weather permitting
1/17/23-1/20/23 8 am – 2 pm Pave Partial lane closure as needed; flaggers directing traffic; large trucks and personnel will be on the roadway. Puna Peleke Rd from end to end Weather permitting
1/23/23-1/27/23 8 am-2 pm Grading of Roadway Potential lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. Puna Chain Of Craters from end of HWY 130 to First Gate Weather permitting
1/23/23-1/27/23 8 am-2 pm Grading of Roadway Potential lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway Puna N.kaohe Hmstd from South Road to North Road Weather permitting
1/23/23-1/27/23 8 am-2 pm Grading of Roadway Potential lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. Puna Upper Puna Road from Aloha Road to End Weather permitting
1/23/23-1/27/23 8 am-2 pm Pave Potential lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. S. Kohala Pu’u Nohea from Pu’u Nani Dr to Pu’u Nani Dr Weather permitting
1/23/23-1/27/23 8 am-2 pm Tree Trimming Potential lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway. Ka’u Old Māmalahoa Highway Hwy 11 to Hwy 11 Weather permitting
Engineering
1/23/23-1/27/23 8:30 am – 3:00 pm Construction Project: Kalaniana’ole Ave Reconstruction, Kamehameha/Railroad Ave. to Ka’uhane Ave Roadway and shoulder work S. Hilo Between Silva Street and Kauhane
1/23/23-1/27/23 24 hours a day Bridge Closed:  Ka’ahakini Bridge & Kolekole Bridge Detour – use Chin Chuck and Kanna Road. S. Hilo Old Māmalahoa Hwy – just north of Kaiwiki Homestead Road & at Kolekole Beach Park.
1/23/23-1/27/23 24 hours a day Temporary Bridge Open:  Makea Bridge Detour route is closed. S. Hilo Kaupakuea Homestead Road – north of Andrade Rd. Temporary Bridge Open.
1/23/23-1/27/23 8:00 am – 5:00 pm Construction Project: Waiānuenue Ave. Rehab., Kaiulani Street to Rainbow Drive Pavement Striping – Lane Shifts S. Hilo Between Rainbow Drive to Kaiulani Street
1/23/23-1/27/23 24 hours a day Ali’I Drive Emergency Road Project Traffic will be limited to one (1) north bound travel lane Kona Between Kailua Pier and Likana lane
Traffic
1/23/2023 – 1/27/2023 8:30am – 2:00pm Install pavement markings on resurfaced roadway Expect officers directing traffic and minor delays. Puna Ainaloa Blvd
1/23/2023 – 1/27/2023 8:30am – 2:00pm Maintenance of pavement markings Expect officers directing traffic and minor delays. S. Hilo E. Mamaki St. Auwae Rd. Elama Rd
1/23/2023 – 1/27/2023 8:00am -2:00pm Remove existing pavement markings & install new traffic pattern Expect officers directing traffic and minor delays. S. Kohala Saddle Rd                                                                              (4) culverts located approx. 1.5mi from Hwy 190 to 2.3mi from Hwy 190